skip to content

← back to the plays

independence3 unconnected
applies to

b2b, no audience needed

outcome not stated

confidence

high

evidence

3 claims · 3 articles · 2 receipts

window

2021-11-182021-11-18

3 builders who never spoke to each other

Run a public waiting list and report its size

A waiting list is both the demand signal and the progress metric while there is nothing to ship, and it works for a version that does not exist yet as long as you name a date. Offering more than one way to follow along catches the people who will not hand over an address today.


The method

  1. 01

    Run a waitlist while you build and treat its size as the progress number you report.

  2. 02

    Take signups for a platform version you have not shipped yet, and give a date.

  3. 03

    Give a pre-launch product three ways to be followed at once, a waiting list, a show, and a social account, rather than one signup box.


What it returned

  • 215

    The MDX.one waitlist reached 215 people during May, before launch.

  • 2022

    A dedicated page collected signups for the iOS beta while only Android existed, with release stated as around March 2022.


Sources


the second source

Three plays a week, for the phase you are in

No roundup of links, no news. Three tactics more than one builder arrived at separately, with the numbers each one returned and the disagreements left in.

One email a week. Unsubscribe in one click, and the address is used for this and nothing else.


More in email

all email plays

the second source

Three plays a week, for the phase you are in

No roundup of links, no news. Three tactics more than one builder arrived at separately, with the numbers each one returned and the disagreements left in.

963 corroborated plays to draw from · 3 a week

One email a week. Unsubscribe in one click, and the address is used for this and nothing else.